The following documents the discussions addressed at the Senior Staff and Center Directors’ Meeting on December 13, 1999. Mr. Goldin did not attend the meeting. Action assignments have been placed […]
Cassini Significant Events for Friday, 12/03/99 – Thursday, 12/09/99
Events on board the Spacecraft this week include two data playbacks from the CDA (Cosmic Dust Analyzer) and the standard Periodic Engineering Maintenance. Results from this activity and from real-time […]
Marshall Researchers Developing Patch Kit to Mitigate ISS Impact Damage
[From October 1999, Vol. 4 Issue 4, of Orbital Debris Quarterly News.] Marshall Researchers Developing Patch Kit to Mitigate ISS Impact Damage By Stephen B. Hall, FD23A, KERMIt Lead Engineer, […]
XMM takes pictures of itself!
ESA Science News http://sci.esa.int 11 Dec 1999 XMM takes pictures of itself! The XMM spacecraft, launched on 10 December from Kourou, has sent back pictures of itself in space. The […]
XMM in safe hands
ESA Science News http://sci.esa.int XMM in safe hands 11 Dec 1999 During the first hours after XMM’s acquisition by the Perth ground station, the spacecraft control teams at ESOC nursed […]
NASA Daily News Summary – Media Advisory m99-255
NASA Daily News Summary For Release: Dec. 10, 1999 Media Advisory m99-255 SUMMARY: NASA OPENS NEW, VIRTUAL AIRPORT CONTROL TOWER AT AMES Video File for Dec. 10, 1999 NOTE: ALL […]
NASA New Millenium Program Selects Advanced Earth Observing Concept
David E. Steitz Headquarters, Washington, DC (Phone: 202/358-1730) RELEASE: 99-144 NASA NEW MILLENNIUM PROGRAM SELECTS ADVANCED EARTH OBSERVING CONCEPT NASA will flight-test an instrument using new technologies to measure elements […]
Representative Weldon Disappointed with Mars Polar Lander Failure But Encourages Optimism
FOR IMMEDIATE RELEASE CONTACT: Craig Stevens 202.225.3671 craig.stevens@mail.house.gov Representative Weldon Disappointed with Mars Polar Lander Failure But Encourages Optimism WASHINGTON, DC- – In the face of the apparent failure of […]
Mars Polar Lander Mission Status December 10, 1999
MEDIA RELATIONS OFFICE JET PROPULSION LABORATORY CALIFORNIA INSTITUTE OF TECHNOLOGY NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PASADENA, CALIF. 91109. TELEPHONE (818) 354-5011 http://www.jpl.nasa.gov Mars Polar Lander Mission Status December 10, 1999 […]
NEAR Mission Status Report December 10, 1999
NEAR Mission Status Reports – http://near.jhuapl.edu December 10, 1999 MISSION OPERATIONS: The NEAR spacecraft continued to operate nominally in Operational Mode with Flight Computer #1 and Attitude Interface Unit #2 […]